<entry>
  <id>tag:status.enum.co,2005:Maintenance/cmlatllep006crykygu3mdw46</id>
  <published>2026-02-09T02:00:00.000+00:00</published>
  <updated>2026-02-09T02:00:00.000+00:00</updated>
  <link rel="alternate" type="text/html" href="https://status.enum.co/maintenance/cmlatllep006crykygu3mdw46"/>
  <title>Datacenter power supply</title>

  <content type="html">
  <![CDATA[
    <p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 1 day and 2 hours</p>
    <p><strong>Affected Components:</strong> DNS, Identity &amp; Access, Network, Compute, Object Storage, Load Balancer, Firewall, Kubernetes, Block Storage</p>
    <p><small>Feb <var data-var='date'> 9</var>, <var data-var='time'>02:00:00</var> GMT+0</small><br /><strong>Identified</strong> -
  Due to scheduled work by the local power grid operator, the data center location will temporarily operate on backup power systems (generator supply) during the above-mentioned period.

Power will be supplied by fully redundant diesel generators (at least N+1). The transition to backup power and the return to normal operation will be carried out in a controlled, step-by-step manner under continuous monitoring by the data center operator.

The data center provider does not expect any impact on services during these works. However, as a precaution, we would like to note that operations will be running outside of the regular normal state.

The data center operator will have additional specialized personnel on site throughout the entire maintenance window and will provide building-specific updates regarding each power transition..</p>
<p><small>Feb <var data-var='date'> 9</var>, <var data-var='time'>02:00:01</var> GMT+0</small><br /><strong>Identified</strong> -
  Maintenance is now in progress.</p>
<p><small>Feb <var data-var='date'> 10</var>, <var data-var='time'>04:00:00</var> GMT+0</small><br /><strong>Completed</strong> -
  Maintenance has completed successfully.</p>

        ]]>